1
/
of
2
Rogz
Rogz Control Lead Medium 1.4m x 16mm
Rogz Control Lead Medium 1.4m x 16mm
Regular price
£19.99
Regular price
£21.99
Sale price
£19.99
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
Rogz Utility Control Leads are recommended for behaviour correction and training. A soft neoprene handle and shock-absorbing webbing reduces strain on you and your dog to help prevent injury. For close control, the ShocLoc control feature allows you to lock out the shock-absorbing webbing. Waste bag and accessory holders are convenient and a SnapLoc trigger hook enables easy attachment and safety.
FEATURES AND BENEFITS
Reflective Stitching: Reflective yarn is woven into the webbing for night-time visibility.
Shock Absorbing Webbing: Eases the pull strength placed on you and your dog.
ShocLocTM Control: Designed to Lockout the absorbing function of the bungee.
SnapLocTM Trigger Hook: Lockable Trigger Hook to ensure control & safety.
Waste Bag Holder: Accessory to hold your waste bag.
Share
