Skip to product information
1 of 2

Rogz

Rogz Control Lead Medium 1.4m x 16mm

Rogz Control Lead Medium 1.4m x 16mm

Regular price £19.99
Regular price £21.99 Sale price £19.99
Sale Sold out
Tax included. Shipping calculated at checkout.
colour
Rogz Utility Control Leads are recommended for behaviour correction and training. A soft neoprene handle and shock-absorbing webbing reduces strain on you and your dog to help prevent injury. For close control, the ShocLoc control feature allows you to lock out the shock-absorbing webbing. Waste bag and accessory holders are convenient and a SnapLoc trigger hook enables easy attachment and safety.

FEATURES AND BENEFITS
Reflective Stitching: Reflective yarn is woven into the webbing for night-time visibility.
Shock Absorbing Webbing: Eases the pull strength placed on you and your dog.
ShocLocTM Control: Designed to Lockout the absorbing function of the bungee.
SnapLocTM Trigger Hook: Lockable Trigger Hook to ensure control & safety.
Waste Bag Holder: Accessory to hold your waste bag.
View full details