Rogz Control Long Lead Black 1.2m / Extra Large
12ROGZ130
RRP:
£29.99
£28.99
In stock
Description
Rogz Control Long Lead Black 1.2m / Extra Large
The Rogz control long lead is one of the most sophisticated leads available to buy. It features shock absorbing technology to take the strain from your arms if the dog pulls. The lead also features a close control handle which helps with heel training and to gain a shorter lead in traffic or crowds. This lead is made from super strong reflective nylon for added safety at night.